| 1. |
Route Survey and Collecting data. |
| |
i. |
Survey and collecting data as per specification of client of proposed OFC Route. |
| 2. |
Preparation of AutoCAD drawings. |
| |
i. |
Converting Survey data & Preparation of AutoCAD drawings as per specification of client of proposed OFC Route. |
| 3. |
Preparation of Bill of quantities. |
| |
i. |
Preparation of proposed Bill of Quantities as per specification of client of proposed OFC Route. |
| 4. |
Getting permission from Government departments |
| |
i. |
Submission of route drawings and Getting permission of the proposed ROW corridor from relevant Government departments like NHAI, P.W.D, BSNL and railway departments |
| 5. |
Laying of 'n' number of H.D.P.E ducts by normal Trenching method. |
| |
i. |
Laying of 'n' number of HDPE ducts by normal Trenching method upto 1.65m depth or as per specification of client by manpower digging procedure by engaging skilled supervisors and labour groups with suitable tools and accessories. |
| |
ii. |
Laying of 'n' number of HDPE ducts by normal Trenching method upto 1.65m depth or as per specification of client by machinery digging procedure by engaging machines like Trenchers and excavators. |
| 6. |
Laying of 'n' number of H.D.P.E ducts by Trenchless method like H.D.D. |
| |
i. |
Laying of 'n' number of HDPE ducts by Trenchless method like H.D.D. where ever normal trenching is not possible like River crossings, Drain crossings, Road Crossings, National Highway Crossings, City Area, Temples Area and Grave yards Area by using our own Horizontal Directional Drilling (H.D.D) machines. |
| 7. |
D.I.T (Duct Integration Test) |
| |
i. |
Performing Duct Integration Test as per specification of client. |
| 8. |
Chambers / Manholes |
| |
i. |
Preparation of Concrete Chambers / Manholes as per specification of client. |
| |
ii. |
Installation of Concrete Chambers / Manholes at particular locations as per specification of client. |
| 9. |
Blowing of OFC Cable |
| |
i. |
Blowing of the OFC Cable in particular duct as per specification of client. |
| 10. |
Splicing of the OFC Cable |
| |
i. |
Splicing of the OFC Cable as per specification of client. |
| 11. |
Termination |
| |
i. |
Termination of the OFC Cable as per specification of client. |
| 12. |
Preparation of Measurement Sheets |
| |
i. |
Preparation of measurement sheets as per specification of client in coordination with client. |
| 13. |
Asbuilt Survey, Asbuilt drawings and Complete Documentation |
| |
i. |
Final Asbuilt Survey and preparation of Asbuilt drawings and complete documentation as per specification of client. |